Scheduled tasks
Set timing for a repeatable task and verify what each scheduled run did.
Create a schedule
- Open Tasks in Full workspace. You can also open the schedule draft from an active, published workflow or from a supported Work Pack instance.
- Pick a one-time, repeating, or interval trigger where offered. Check the timezone, next run, project context, and target. Keep the execution input and expected result in the linked workflow or instance.
- Check that the desktop scheduler and runtime are ready. Test the linked workflow or Work Pack with safe input before saving a recurring schedule. Saving creates an active schedule. Use Pause to stop future triggers while investigating, or Run on a saved safe test task to inspect its result.
After a missed or failed run
Start with the scheduled task's latest run. Check whether the desktop was available and whether it stopped on a missing model, grant, or approval. Before retrying, check for an existing output or external receipt. For scheduled channel delivery, use Approvals to check the target, quota and expiry.